Namma Metro Route

Chikkabidarakallu Swami Vivekananda Road

23 stops · 26.4 km · 1h 3m · 1 interchange

Chikkabidarakallu to Swami Vivekananda Road by Namma Metro

The metro journey from Chikkabidarakallu to Swami Vivekananda Road runs on the Green Line and Purple Line, changing at Nadaprabhu Kempegowda Station. It covers 26.4 km and 23 stops, taking about 1h 3m end to end — roughly 25 km/h once station stops are counted. A token costs 80, or about ₹72–₹76 with a Namma Metro smart card.

Board at Chikkabidarakallu on Platform 2, on the side signposted towards Silk Institute — that is the direction of travel, not your destination. Change at Nadaprabhu Kempegowda Station; the interchange is inside the paid area, so one ticket covers the whole trip. First train is around 5:00 AM on weekdays and 7:00 AM on Sundays, with the last around 11:05 PM.

Estimated Fare — BMRCL Tariff

Token

80

Single-use ticket

5–10% OFF

Namma Card

72–₹76

Smart card · depends on time of day

How to Travel

Green Line15 stops
ChikkabidarakalluBoard
▶ Towards Silk InstitutePlatform 2
14 intermediate stops
  1. Manjunathnagar
  2. Nagasandra
  3. Dasarahalli
  4. Jalahalli
  5. Peenya Industry
  6. Peenya
  7. Goraguntepalya
  8. Yeshwanthpur
  9. Sandal Soap Factory
  10. Mahalakshmi
  11. Rajajinagar
  12. Kuvempu Road
  13. Srirampura
  14. Mantri Square Sampige Road
Nadaprabhu Kempegowda StationInterchange →

Change train here — follow signs for the next platform

Purple Line8 stops
Nadaprabhu Kempegowda StationBoard
▶ Towards Whitefield (Kadugodi)Platform 1
7 intermediate stops
  1. Sir M Visvesvaraya Station
  2. Dr. BR Ambedkar Station
  3. Cubbon Park
  4. MG Road
  5. Trinity
  6. Halasuru
  7. Indiranagar
Swami Vivekananda RoadAlight

Journey Summary

Total Stops

23

Distance

26.4 km

Est. Time

1h 3m

Fares are per BMRCL tariff. Journey time includes 5 min interchange wait. Children below 3 ft height travel free.

Service Hours — Green Line & Purple Line

First (Mon–Sat)

5:00 AM

First (Sunday)

7:00 AM

Last train

11:05 PM

Peak frequency

4–6 min / 3–5 min

This journey uses more than one line, so the usable window is set by whichever line starts latest and finishes earliest — shown above. Allow a few extra minutes at Chikkabidarakallu for security screening, which is mandatory at every Namma Metro entrance.

Colleges & Institutions near Swami Vivekananda Road

ChikkabidarakalluSwami Vivekananda Road — Common Questions

How long does the metro take from Chikkabidarakallu to Swami Vivekananda Road?

About 1h 3m in normal running, covering 26.4 km and 23 stops — an average of roughly 25 km/h including station dwell time, and this figure already allows 5 minutes to change lines at Nadaprabhu Kempegowda Station.

What is the metro fare from Chikkabidarakallu to Swami Vivekananda Road?

A single-journey token costs ₹80 at the current BMRCL tariff. Paying with a Namma Metro smart card brings it down to about ₹72–₹76, since the card discount is 10% off-peak and 5% during weekday peak hours. Children under 3 ft travel free.

Do I need to change trains between Chikkabidarakallu and Swami Vivekananda Road?

Yes — this journey uses the Green Line and Purple Line, changing at Nadaprabhu Kempegowda Station. Stay on board until Nadaprabhu Kempegowda Station, then follow the platform signs for the Purple Line. Interchanges are within paid areas, so you do not need to buy a second ticket.

What time is the first and last metro from Chikkabidarakallu?

On this route the first train is around 5:00 AM Monday to Saturday and 7:00 AM on Sunday, with the last train at about 11:05 PM. Trains run every 4–6 min / 3–5 min in peak hours. Times are BMRCL scheduled service — allow a few minutes for security screening at the entrance.

Related Metro Routes

Business near Swami Vivekananda Road?

Reach commuters heading here

Sponsored listing from ₹1,500/month

Advertise →