Namma Metro Route

Yelachenahalli Central Silk Board

7 stops · 8.0 km · 23m · 1 interchange

Yelachenahalli to Central Silk Board by Namma Metro

The metro journey from Yelachenahalli to Central Silk Board runs on the Green Line and Yellow Line, changing at Rashtreeya Vidyalaya Road. It covers 8.0 km and 7 stops, taking about 23m end to end — roughly 21 km/h once station stops are counted. A token costs 40, or about ₹36–₹38 with a Namma Metro smart card.

Board at Yelachenahalli on Platform 1, on the side signposted towards Madavara — that is the direction of travel, not your destination. Change at Rashtreeya Vidyalaya Road; the interchange is inside the paid area, so one ticket covers the whole trip. First train is around 6:00 AM on weekdays and 7:00 AM on Sundays, with the last around 11:05 PM.

Estimated Fare — BMRCL Tariff

Token

40

Single-use ticket

5–10% OFF

Namma Card

36–₹38

Smart card · depends on time of day

How to Travel

Green Line3 stops
YelachenahalliBoard
▶ Towards MadavaraPlatform 1
2 intermediate stops
  1. Jaya Prakash Nagar
  2. Banashankari
Rashtreeya Vidyalaya RoadInterchange →

Change train here — follow signs for the next platform

Yellow Line4 stops
Rashtreeya Vidyalaya RoadBoard
▶ Towards Delta Electronics BommasandraPlatform 2
3 intermediate stops
  1. Ragigudda
  2. Jayadeva Hospital
  3. BTM Layout
Central Silk BoardAlight

Journey Summary

Total Stops

7

Distance

8.0 km

Est. Time

23m

Fares are per BMRCL tariff. Journey time includes 5 min interchange wait. Children below 3 ft height travel free.

Service Hours — Green Line & Yellow Line

First (Mon–Sat)

6:00 AM

First (Sunday)

7:00 AM

Last train

11:05 PM

Peak frequency

4–6 min / 5–8 min

This journey uses more than one line, so the usable window is set by whichever line starts latest and finishes earliest — shown above. Allow a few extra minutes at Yelachenahalli for security screening, which is mandatory at every Namma Metro entrance.

Colleges & Institutions near Central Silk Board

YelachenahalliCentral Silk Board — Common Questions

How long does the metro take from Yelachenahalli to Central Silk Board?

About 23m in normal running, covering 8.0 km and 7 stops — an average of roughly 21 km/h including station dwell time, and this figure already allows 5 minutes to change lines at Rashtreeya Vidyalaya Road.

What is the metro fare from Yelachenahalli to Central Silk Board?

A single-journey token costs ₹40 at the current BMRCL tariff. Paying with a Namma Metro smart card brings it down to about ₹36–₹38, since the card discount is 10% off-peak and 5% during weekday peak hours. Children under 3 ft travel free.

Do I need to change trains between Yelachenahalli and Central Silk Board?

Yes — this journey uses the Green Line and Yellow Line, changing at Rashtreeya Vidyalaya Road. Stay on board until Rashtreeya Vidyalaya Road, then follow the platform signs for the Yellow Line. Interchanges are within paid areas, so you do not need to buy a second ticket.

What time is the first and last metro from Yelachenahalli?

On this route the first train is around 6:00 AM Monday to Saturday and 7:00 AM on Sunday, with the last train at about 11:05 PM. Trains run every 4–6 min / 5–8 min in peak hours. Times are BMRCL scheduled service — allow a few minutes for security screening at the entrance.

Related Metro Routes

Business near Central Silk Board?

Reach commuters heading here

Sponsored listing from ₹1,500/month

Advertise →