Namma Metro Route

Yelachenahalli Sandal Soap Factory

16 stops · 18.4 km · 40m

Yelachenahalli to Sandal Soap Factory by Namma Metro

The metro journey from Yelachenahalli to Sandal Soap Factory runs on the Green Line. It covers 18.4 km and 16 stops, taking about 40m end to end — roughly 28 km/h once station stops are counted. A token costs 70, or about ₹63–₹66.50 with a Namma Metro smart card.

Board at Yelachenahalli on Platform 1, on the side signposted towards Madavara — that is the direction of travel, not your destination. There is no change of train on this route. First train is around 5:00 AM on weekdays and 7:00 AM on Sundays, with the last around 11:05 PM.

Estimated Fare — BMRCL Tariff

Token

70

Single-use ticket

5–10% OFF

Namma Card

63–₹66.50

Smart card · depends on time of day

How to Travel

Green Line16 stops
YelachenahalliBoard
▶ Towards MadavaraPlatform 1
15 intermediate stops
  1. Jaya Prakash Nagar
  2. Banashankari
  3. Rashtreeya Vidyalaya Road
  4. Jayanagar
  5. South End Circle
  6. Lalbagh
  7. National College
  8. Krishna Rajendra Market
  9. Chickpete
  10. Nadaprabhu Kempegowda Station
  11. Mantri Square Sampige Road
  12. Srirampura
  13. Kuvempu Road
  14. Rajajinagar
  15. Mahalakshmi
Sandal Soap FactoryAlight

Journey Summary

Total Stops

16

Distance

18.4 km

Est. Time

40m

Fares are per BMRCL tariff. Journey time includes 0 min interchange wait. Children below 3 ft height travel free.

Service Hours — Green Line

First (Mon–Sat)

5:00 AM

First (Sunday)

7:00 AM

Last train

11:05 PM

Peak frequency

4–6 min

Monday mornings the Green Line starts earlier than the rest of the week to clear the backlog from Sunday night track maintenance. Allow a few extra minutes at Yelachenahalli for security screening, which is mandatory at every Namma Metro entrance.

Colleges & Institutions near Sandal Soap Factory

YelachenahalliSandal Soap Factory — Common Questions

How long does the metro take from Yelachenahalli to Sandal Soap Factory?

About 40m in normal running, covering 18.4 km and 16 stops — an average of roughly 28 km/h including station dwell time.

What is the metro fare from Yelachenahalli to Sandal Soap Factory?

A single-journey token costs ₹70 at the current BMRCL tariff. Paying with a Namma Metro smart card brings it down to about ₹63–₹66.50, since the card discount is 10% off-peak and 5% during weekday peak hours. Children under 3 ft travel free.

Is there a direct metro from Yelachenahalli to Sandal Soap Factory?

Yes. Yelachenahalli and Sandal Soap Factory are both on the Green Line, so it is a direct ride with no change of train. Board on Platform 1 towards Madavara.

What time is the first and last metro from Yelachenahalli?

On this route the first train is around 5:00 AM Monday to Saturday and 7:00 AM on Sunday, with the last train at about 11:05 PM. Trains run every 4–6 min in peak hours. Times are BMRCL scheduled service — allow a few minutes for security screening at the entrance.

Related Metro Routes

Business near Sandal Soap Factory?

Reach commuters heading here

Sponsored listing from ₹1,500/month

Advertise →